NASHUA / CASTROVILLE APPROACH TO HIGHWAY 1, Monterey County — October 31, 2026. A regional climate-resilience study could influence future travel on one of the highways connecting Nashua Road to the coast. The Transportation Agency for Monterey County (TAMC) is investigating flooding and sea-level-rise risks along the Highway 1–Elkhorn Slough corridor, with emphasis on the state highway and the Union Pacific rail line between Castroville and Salinas Road.

What is the project reviewing?

TAMC's public 2026 outreach page says the work considers alternative ways to protect vital transportation infrastructure and adapt to higher water levels, including potential nature-based approaches. The agency invited local residents to share observed flooding and transportation problems using community workshops and surveys.

The project is part of a planning and environmental-linkages study, not a notice that Highway 1 will be moved or that a new road will be built. TAMC's published information focuses on the coastal and slough portions of the highway rather than the entire Nashua Road alignment.

Where Nashua Road fits

Nashua Road is a county-maintained corridor between Cooper Road and Highway 1 near Castroville. Disruptions on the state highway could affect nearby agricultural and commuter travel, but this corridor-level planning document does not claim that Nashua Road currently faces closure due to sea-level rise or that its intersection will be reconstructed as part of an approved alternative.

What choices remain open?

The agency's study is assessing engineering, environmental and community concerns before recommending future adaptations. A potential elevation, realignment or habitat restoration concept would require detailed design, environmental approvals and funding. Residents should request the eventual alternatives map and identify whether the Highway 1/Nashua Road connection falls inside any selected construction limits.

How can residents participate?

The TAMC outreach page provides a community survey link and lists contact information for the agency. For existing road conditions consult Caltrans QuickMap and county road advisories, not an abstract long-term climate vulnerability map.

Primary source: TAMC, Highway 1 Elkhorn Slough Corridor Climate Resiliency Project public outreach information, 2026. This article concerns regional planning near Nashua, not a current closure or a funded Nashua Road project.

Help Nashua News grow Help strengthen reporting on Nashua: community voices, important decisions and local life.
Support Nashua News

Choose how to support Nashua News:

Credit / Debit Card via Stripe

Choose your contribution amount on the secure California58 Stripe checkout. One-time support for independent local journalism.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Nashua News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.

Nashua News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Nashua News newsroom →

More from Nashua News

Visit Nashua News →

СООБЩЕСТВО

Комментарии

Присоединяйтесь к обсуждению California58. Чтобы комментировать, необходимо войти в аккаунт.